Žitný ostrov – Gabčíkovo region – waste water diversion and treatment

Client VODOHOSPODÁRSKE STAVBY – ecological company as. Construction period August 2022 – May 2025 Description of objects: The subject of the performance is the construction of sewerage in the villages Baka and Jurová in total length 15,022 km (of which 10,078 km are gravity sewerage and 4,944 km pressure sewerage), including 10 pumping stations and…

Záhorská Bystrica, Renovation of the water supply on Donská street and Reduction shaft, connection near D2

Client Bratislavská vodárenská spoločnost, a.s. Construction period October 2022 – May 2023 Construction technology: The subject of the performance is the implementation of construction works for the rehabilitation of the existing DN200 pipeline for a new pipe made of ductile iron TVLT (PN10) – DN300 with a length of approx. 795 m. The entire rehabilitation…

Bratislava, Hradská street – Reconstruction of the water supply

Client Bratislavská vodárenská spoločnost, a.s. Construction period May 2022 – September 2022 Description of objects: The subject of the performance is the realization of the public water supply pipe on Hradská street, that includes to provide the necessary permits and engineering activity necessary for the realization of the construction. The existing water supply pipe will…

WWTP Kolárovo – reconstruction and extension 1st stage

https://www.tucon.sk/wp-content/uploads/Tucon-Kola-rovo-FHD.mp4 Client: Západoslovenská vodárenská spoločnosť, a.s. Construction period: March 2022 – October 2023 Construction technology: The subject of the project is the reconstruction and extension of the existing Kolárovo WWTP to a total capacity of 13,750 PE. The construction of the WWTP will take place during full operation of the original pumping station resp. without…

Complete reconstruction of the state road N08 Interlaken-Ost-Brienz, Switzerland

Investor Bundesamt für Strassen ASTRA, Filiale Thun, CH-6300 Thun Higher supplier ARGE Marti Brienzersee Construction period January 2021 – December 2022 Description of main objects: Complete reconstruction of the state N08 between Interlaken Ost and Brienz. Section length: 13,83 km maintenance section no. 60 Number of bridges and other civil engineering structures: 38 Number of…