Veľké Zálužie – Public Sewerage System, WWTP Expansion and Upgrade

Investor: Municipality Veľké Zálužie Main contractor: JV„Združenie Veľké Zálužie, M-E“ (Members: Marti a.s. a EKO SVIP s.r.o.) Construction period: 08/2026 – 11/2026 Description: The project involves the construction of a new sanitary sewerage system with a total length of 13,481 metres, including the installation of 812 sewer connections (809 DN150 connections, 2 DN200 combined connections…

Reconstruction of emergency condition Public Water Supply Branch on K Horánskej Studni Street, BA

Investor: Bratislavská vodárenská spoločnosť, a.s. Main contractor: Marti a.s. Construction period: 08/2026 – 11/2026 Description of built structures: Emergency reconstruction of the public water supply branch. Construction Technology:  The water supply pipeline will be replaced using the open-cut excavation method. Before the excavation works commence, a temporary bypass pipeline will be installed to ensure the…

Lednické Rovne – Dolná Breznica, Sewerage and WWTP, Phase II, Water Supply System

Investor: Považská vodárenská spoločnosť, a.s. Main contractor: „Joint Venture VÁHOSTAV – MARTI – Lednické Rovne“ VÁHOSTAV, a.s., Marti a.s. Construction period: 05/2026 – 05/2028 Description of built structures: The project involves the completion of the sewerage system for the Lednické Rovne agglomeration: Completion of the sewage network in Lednické Rovne within the existing concentrated residential…

SKK Žilina – Ul. 1. mája – Reconstruction of the sewage system, BT DN 600/400 mm – Phase III

Investor: Severoslovenské vodárne a kanalizácie, a. s. Main contractor: Marti a.s. Construction period: 04/2026 – 05/2026 Object Description: The project includes the reconstruction of a sewer system BT DN 600/400 mm, carried out under full operational conditions, over a length of 115 m along the 1.mája Street and 70 m along the P. O. Hviezdoslav…

Limbach, Vinohradnícka Street – Public Water main Supply System reconstruction

Investor: Bratislavská vodárenská spoločnosť, a. s. Main contractor: Marti a.s. Construction period: 10/2025 – 11/2026 Object Description: The project is an underground linear structure and its subject is the reconstruction of the existing public water main supply DN80 – DN150 with a total length of 814.01 m. The proposed reconstruction works consist of no 1…

Bratislava, Hraničná Street – Water main reconstruction in DN300 collector

Investor: Bratislavská vodárenská spoločnosť, a. s. Main contractor: Marti a.s. Construction period: 05/2025 – 11/2026 Description of built structures: This project involves a comprehensive solution for the reconstruction of the existing public water supply steel pipe DN300 in total length of 1114.33m, where the horizontal part is 1101.02m long and vertical part is 13.31m long…

ŽSR, Completion of the Žilina -Teplička railway shunting station

Investor Railways of the Slovak Republic General contractor EUROVIA CS, a.s. – organizational unit Slovakia Construction period March 2021 – 2026 Description of the objects: BO 53-37-01 Žilina Strážov – Váh, rain sewerage BO 53-37-02 Žilina Strážov – Váh, relocation of water mains BO 53-37-03 Žilina Strážov – Váh, relocation of sewerage Construction technology: BO…