Dubník-Svodín, reconstruction of long-distance water pipeline DN 600

Object: SO 01 Reconstruction of long-distance water pipeline km 0.000 00 – 1.359 34 Client: Západoslovenská vodárenská spoločnosť, a.s. Construction period: May 2024 – November 2024 Description of objects: The DN 600 water pipeline in the section Kolta – Svodín is part of the pipeline that supplies the city of Štúrovo and the adjacent villages…

Bratislava, Vajnorská street – rehabilitation of public water supply and public sewerage system

Investor: Bratislavská vodárenská spoločnosť, a.s. Construction period: August 2023 – 31st March 2026 Description of objects: SO 01 Public water supply: The renovation of the water supply system involves the reconstruction of the existing water supply system with a total length of 690.9 m, a connection to Česká Street with a length of 28.5 m,…

VDJ Vtáčnik, rehabilitation of the storage chamber

Investor Bratislavská vodárenská spoločnosť, a. s. Construction period July 2023 – April 2024 Description of objects: The subject of the contract is the rehabilitation of the storage chamber at the Reservoir Vtáčnik 1×7300 m3 in Bratislava. The subject of the implementation will be the rehabilitation of walls, ceiling beams, rehabilitation of defects in the structure,…

Záhorská Bystrica, Renovation of the water supply on Donská street and Reduction shaft, connection near D2

Client Bratislavská vodárenská spoločnost, a.s. Construction period October 2022 – May 2023 Construction technology: The subject of the performance is the implementation of construction works for the rehabilitation of the existing DN200 pipeline for a new pipe made of ductile iron TVLT (PN10) – DN300 with a length of approx. 795 m. The entire rehabilitation…

Bratislava, Hradská street – Reconstruction of the water supply

Client Bratislavská vodárenská spoločnost, a.s. Construction period May 2022 – September 2022 Description of objects: The subject of the performance is the realization of the public water supply pipe on Hradská street, that includes to provide the necessary permits and engineering activity necessary for the realization of the construction. The existing water supply pipe will…

Záhorská Bystrica – reservoir, supply and stock pipes

Investor Bratislavská vodárenská spoločnosť a. s. Construction period March 2021 – November 2022 Description of the objects: The construction consists of a line part, a supply pipe DN200 to the reservoir and supply piping DN150 and DN300, NN connection and reservoir. The reservoir is divided into a handling (dry) and wet chamber. The wet chamber consists…

Veľké Leváre – Sanation of the public water main

Client Bratislavská vodárenská spoločnosť, a.s. Construction period January 2021 – August 2023 Technology of the construction: Reconstruction of the existing pipeline in the part of the municipality due to the emergency condition, bad technical conditions, but mainly due to increased incrustations in the pipeline which reduce water flow and need to be replaced with new ones…

Extension of the sewerage, relocation of the water main, Budatín – Horná street

Client Severoslovenské vodárne a kanalizácie, a.s. Construction period July 2020 – November 2020 Description of the objects: BO 01 Extension of the sewerage Branch B: sewerage system –  PVC SN8 DN300 in the total length of 295,7 m Branch C: sewerage system –  PVC SN8 DN300 in the total length of 129,1 m BO 02 Relocation…

Žilina – Brodno – Extension of the water main

Client Severoslovenské vodárne a kanalizácie, a.s. Žilina Construction period March 2019 – June 2020 Technology of the construction: Extension of the water main in Žilina municipality, Brodno district. Water supply will be connected to the existed water supply in location managed by SeVaK, a.s.. Damaged parts of the existed local water supply will be removed. Executed…