Dubník-Svodín, reconstruction of long-distance water pipeline DN 600

Object: SO 01 Reconstruction of long-distance water pipeline km 0.000 00 – 1.359 34 Client: Západoslovenská vodárenská spoločnosť, a.s. Construction period: May 2024 – November 2024 Description of objects: The DN 600 water pipeline in the section Kolta – Svodín is part of the pipeline that supplies the city of Štúrovo and the adjacent villages…

Kamenná Poruba – Expansion of sewerage

Client: Severoslovenské vodárne a kanalizácie, a. s., Žilina Construction period: November 2023 – May 2025 Construction technology: excavation work – trench excavation, trench lining, pipe bed, laying PVC pipe DN 300 (sewage) and HDPE pipe DN 150 (water supply), pipe backfilling, trench backfilling with gradual compaction, final treatment of communications. Description of objects: sewer “K”…

Lipovec – Turčianske Kľačany sewage system – part of Lipovec

Investor Lipovec municipality Contractor: JV TUCON-Combin_Lipovec Construction period: October 2023 – November 2024 Description of objects: Construction of part of the sewage network and sewage connections in the village of Lipovec, specifically on the following SO or PS:   Sewer network Lipovec SO 19 – Lipovec sewage network SO 19/A – Lipovec sewage network -…

Bratislava, Vajnorská street – rehabilitation of public water supply and public sewerage system

Investor: Bratislavská vodárenská spoločnosť, a.s. Construction period: August 2023 – June 2025 Description of objects: SO 01 Public water supply: The renovation of the water supply system involves the reconstruction of the existing water supply system with a total length of 690.9 m, a connection to Česká Street with a length of 28.5 m, connections…

Sewerage of the municipality of Pribeta and WWTP Pribeta

https://www.martias.sk/wp-content/uploads/MARTI-Pribeta-FullHD.mp4 Investor Municipality of Pribeta Construction period June 2023 – January 2025 Description of objects: The subject of the filling is the gravity sewer PVC DN 250 and DN300 of 20 716m length, the HDPE sewage printout DN 65 and DN 80 of 2 043m length, including 8x CHS and 1 218x (9 402m) PVC…

VDJ Vtáčnik, rehabilitation of the storage chamber

Investor Bratislavská vodárenská spoločnosť, a. s. Construction period July 2023 – April 2024 Description of objects: The subject of the contract is the rehabilitation of the storage chamber at the Reservoir Vtáčnik 1×7300 m3 in Bratislava. The subject of the implementation will be the rehabilitation of walls, ceiling beams, rehabilitation of defects in the structure,…

Sewerage of the group of municipalities of Horný Žitný ostrov stage 5 – Sewerage of Čakany

Investor The village of Čakany Construction period June 2023 – December 2023 Description of objects: The subject of the order is construction work – sewerage of the village of Čakany, based on the project documentation. The construction of the work (stage 5) consists of a sewage network in the territory of the intra-village of the…

Nesvady – expansion of sewerage and WWTP

https://www.martias.sk/wp-content/uploads/MARTI-Nesvady-FullHD.mp4 Investor Západoslovenská vodárenská spoločnosť, a.s. Nábrežie za hydrocentrálou 4, 949 01 Nitra Construction period June 2023 – August 2024 Description of objects: The subject of the contract is the construction of the Work – the expansion of the sewage system and the existing Nesvady WWTP – in the following scope:   construction of a…