Záhorská Bystrica – reservoir, supply and stock pipes

Investor Bratislavská vodárenská spoločnosť a. s. Construction period March 2021 – November 2022 Description of the objects: The construction consists of a line part, a supply pipe DN200 to the reservoir and supply piping DN150 and DN300, NN connection and reservoir. The reservoir is divided into a handling (dry) and wet chamber. The wet chamber consists…

Veľké Leváre – Sanation of the public water main

Client Bratislavská vodárenská spoločnosť, a.s. Construction period January 2021 – August 2023 Technology of the construction: Reconstruction of the existing pipeline in the part of the municipality due to the emergency condition, bad technical conditions, but mainly due to increased incrustations in the pipeline which reduce water flow and need to be replaced with new ones…

Extension of the sewerage, relocation of the water main, Budatín – Horná street

Client Severoslovenské vodárne a kanalizácie, a.s. Construction period July 2020 – November 2020 Description of the objects: BO 01 Extension of the sewerage Branch B: sewerage system –  PVC SN8 DN300 in the total length of 295,7 m Branch C: sewerage system –  PVC SN8 DN300 in the total length of 129,1 m BO 02 Relocation…

Motorway D1 Prešov West – Prešov South, Fire-protection water main in Tunnel

Client National Motorway Company a.s. General contractor Doprastav a.s. Construction period July 2020 – September 2021 Description of the objects:  Ensuring a sufficient capacity of fire-protection water in case of a fire in the tunnel Technology of construction: Water supply is designed from spigot pipes and ductile iron pipes DN 150 PN 16, system BLUTOP by…

Increasing the security of the area against the backwater of the Little Danube and the Klátovský arm from river Váh, 1st stage

General contractor JV TuCon – VÁHOSTAV SK, Klátovské rameno, Leader of JV – TuCon Construction period October 2019 – April 2022 Technology of the construction: The structure is a flood protection work, which dams the flow of the Klátovský arm and deflects it to the new built river basin. The dam consists of reinforced concrete „Closing…

Dvory nad Žitavou – Sewerage and WWTP

Investor Municipality of Dvory nad Žitavou Construction period July 2019 – August 2020 Technology of the construction: Construction of the village gravity sewerage made of corrugated pipes PVC-U SN8 DN300 and DN 400. New constructed pumping stations will supply pumping of the sewage water from the lowest level with HDPE SDR17 PN10 d90 (110, 160) pressure…

Žilina – Brodno – Extension of the water main

Client Severoslovenské vodárne a kanalizácie, a.s. Žilina Construction period March 2019 – June 2020 Technology of the construction: Extension of the water main in Žilina municipality, Brodno district. Water supply will be connected to the existed water supply in location managed by SeVaK, a.s.. Damaged parts of the existed local water supply will be removed. Executed…

Design and construction of D4 highway and R7 expressway

Promotional video Client Ministerstvo dopravy a výstavby Slovenskej Republiky General contractor D4R7 Construction s.r.o. Construction period February 2019 – May 2020 Description of the objects: BO520/SO521 – parallel water pipeline made of ductile cast iron DN1400, PN16 in the length of 816m, with 3 revision and 2 shutter shafts; pipeline is installed in protective reinforced concrete pipe…

Force main of pressure sewage system Presskan in WWTP Piešťany

Client Interest grouping of corporate entities PRESSKAN, 916 22 Podolie 566 General contractor TuCon, a.s. Construction period August 2018 – October 2018 Description of objects: Modification of existing pipeline of pressure sewage system Presskan in WWTP Piešťany for the purpose of reliable operation of newly built sewage system in municipalities Podolie and Očkov Building method: Reconstruction…

Modernisation of D1 – section 12, Exit 90 Humpolec – Exit 104 Větrný Jeníkov

Client TGS Joint Venture, Prague General contractor TuCon, a.s. Construction period July 2018 – December 2018 Technology of construction: Demolition of the original rain water sewer of motorway and building of the new rain water dewatering including shafts, connections, mountain inlets, waterproofing tests and camera inspection. Reconstruction of the rain water sewer in the middle of…

Technical infrastructure of the industrial park in Čadca

Client Municipality of Čadca General contractor Severoslovenské vodárne a kanalizácie, a.s. Construction period September 2018 – April 2019 Description of the objects: BO 01 Extension of the public water main BO 02 Extension of the public sewerage system Technology of construction: Pipelines will be placed parallely in a open trench with vertical walls Executed works: BO…