Projekt D15, Bybanen, Løvstakken tunnel, Bergen, Norway

Client Hordaland Fylkeskommune represented by the company BYBANEN Utbygging Main contractor Marti Tunnel AG, Switzerland represented by branch office Marti Tunnel NUF Construction period January 2018 – December 2022 Description of main objects: Double track tram tunnel with cross passages to walk/bike tunnel (as escape tunnel) Walk/bike tunnel as escape tunnel Portal with roundabout at the…

Žilina – Brodno – Extension of the water main

Client Severoslovenské vodárne a kanalizácie, a.s. Žilina Construction period March 2019 – June 2020 Technology of the construction: Extension of the water main in Žilina municipality, Brodno district. Water supply will be connected to the existed water supply in location managed by SeVaK, a.s.. Damaged parts of the existed local water supply will be removed. Executed…

Design and construction of D4 highway and R7 expressway

Promotional video Client Ministerstvo dopravy a výstavby Slovenskej Republiky General contractor D4R7 Construction s.r.o. Construction period February 2019 – May 2020 Description of the objects: BO520/SO521 – parallel water pipeline made of ductile cast iron DN1400, PN16 in the length of 816m, with 3 revision and 2 shutter shafts; pipeline is installed in protective reinforced concrete pipe…

Force main of pressure sewage system Presskan in WWTP Piešťany

Client Interest grouping of corporate entities PRESSKAN, 916 22 Podolie 566 General contractor TuCon, a.s. Construction period August 2018 – October 2018 Description of objects: Modification of existing pipeline of pressure sewage system Presskan in WWTP Piešťany for the purpose of reliable operation of newly built sewage system in municipalities Podolie and Očkov Building method: Reconstruction…

Modernisation of D1 – section 12, Exit 90 Humpolec – Exit 104 Větrný Jeníkov

Client TGS Joint Venture, Prague General contractor TuCon, a.s. Construction period July 2018 – December 2018 Technology of construction: Demolition of the original rain water sewer of motorway and building of the new rain water dewatering including shafts, connections, mountain inlets, waterproofing tests and camera inspection. Reconstruction of the rain water sewer in the middle of…

Technical infrastructure of the industrial park in Čadca

Client Municipality of Čadca General contractor Severoslovenské vodárne a kanalizácie, a.s. Construction period September 2018 – April 2019 Description of the objects: BO 01 Extension of the public water main BO 02 Extension of the public sewerage system Technology of construction: Pipelines will be placed parallely in a open trench with vertical walls Executed works: BO…