Investor:
Severoslovenské vodárne a kanalizácie, a. s.
Main contractor:
Marti a.s.
Construction period:
04/2026 – 05/2026
Object Description:
The project includes the reconstruction of a sewer system BT DN 600/400 mm, carried out under full operational conditions, over a length of 115 m along the 1.mája Street and 70 m along the P. O. Hviezdoslav Street.
The alignment follows the original sewer route. The replacement works are carried out during full sewer operation by means of a temporary bypass of the reconstructed section.
Construction Technology:
- The works are carried out using an open-cut excavation method, including trench excavation, preparation of the pipe bedding, installation of OLS DN 700 piping, connection of existing service connections, and construction of new connections for stormwater inlets.
- Manholes within the affected section are reconstructed from the existing manholes or replaced with new prefabricated manholes.