SKK Žilina – Ul. 1. mája – Reconstruction of the sewage system, BT DN 600/400 mm – Phase III

Investor:

Severoslovenské vodárne a kanalizácie, a. s.

Main contractor:

Marti a.s.

Construction period:

04/2026 – 05/2026

Object Description:

The project includes the reconstruction of a sewer system BT DN 600/400 mm, carried out under full operational conditions, over a length of 115 m along the 1.mája Street and 70 m along the P. O. Hviezdoslav Street.
The alignment follows the original sewer route. The replacement works are carried out during full sewer operation by means of a temporary bypass of the reconstructed section.

Construction Technology: 

  • The works are carried out using an open-cut excavation method, including trench excavation, preparation of the pipe bedding, installation of OLS DN 700 piping, connection of existing service connections, and construction of new connections for stormwater inlets.
  • Manholes within the affected section are reconstructed from the existing manholes or replaced with new prefabricated manholes.