Sewerage of the village Bašovce

Client

Municipality of Bašovce

Project developer:

JV Bašovce, TuCon – MYproject SK

Construction period

March 2025 – August 2025

Description of built structures:

The subject of the performance is the construction of sewerage in the cadastral territory of the  Bašovce municipality with a total length of 1,556 km, of which 1,455 km are gravity sewers and 0,101 km pressure pipeline.

The subject of performance is also the construction of 2 pumping stations and 87 sewage connections.

Construction technology:

  • Installation and preparation of the construction site, surveying works
  • sawing/milling of asphalt surfaces
  • excavation of the trench, lining of the trench walls, bed under the pipeline, laying of sewer pipes, backfilling of the pipeline and backfilling of the trench with compaction
  • lowering of the groundwater level
  • installation of revision shafts
  • realization of sewage connections
  • pipeline pressure tests, shaft watertightness tests
  • construction of pumping stations
  • asphalting of trenches