Client
Závod municipality
Main Contractor
BCI, a.s., Žilina, Subcontactor: TuCon, a.s. part ca 30%
Other Subcontractors: Unistav spol. s r.o. Senica and OHL PS a.s., Bratislava
Construction period
November 2012 – June 2012
Description of Structures:
- SO 01 Pipeline mains DN 300, main sewer B : length 962m, locality IBV : length 570 m, total length of 1532 m
- SO 02 House connections DN 150, main sewer B : length 600 m, locality IBV : length 231 m, total length 831 m
Construction technology:
Excavation, trenches sheeting, complete gravel backfill, concreting of the road th. 200 mm as a base of asphalt cover.









