Reconstruction of emergency condition Public Water Supply Branch on K Horánskej Studni Street, BA

Investor:

Bratislavská vodárenská spoločnosť, a.s.

Main contractor:

Marti a.s.

Construction period:

08/2026 – 11/2026

Description of built structures:

Emergency reconstruction of the public water supply branch.

Construction Technology: 

The water supply pipeline will be replaced using the open-cut excavation method. Before the excavation works commence, a temporary bypass pipeline will be installed to ensure the continuous supply of drinking water to the affected properties. Following the completion of the service connections to the new pipeline, the temporary bypass pipeline will be removed. The new pipeline will be constructed from DN100 ductile iron pipe with the required fittings. The pipeline will be laid on and surrounded by a sand-gravel bedding, after which the excavation will be backfilled with crushed aggregate. The trench will be closed with a concrete cover reinforced with welded wire mesh.