Client
Podunajské Biskupice municipality
General contractor
Joint venture Podunajské Biskupice, T-H-S, TuCon – leader of the Joint venture
Construction period
April 2014 – June 2015
Objects description: Completing of the gravity sewage system on the territory of the city part Bratislava – Podunajské Biskupice in the total length 15,171 km.
- main sewage collectors,
- house connections,
- street drains connections,
- surface stabilization.
Construction technology: Excavation technology (open trench)










