Talc deposit in Gemerská Poloma – Open Mine the 2nd stage

Client

VSK MINING s.r.o.

Superior Contractor

TuCon a.s.

Construction period

July 2010 – August 2010

Structures description:

  • Footway – stepladders and platforms assembly

Construction technology:

  • Footway assembly in the ventilation shaft 320 m of length in direction from the top to the bottom of shaft by using of Alimag driving platform

Executed Works:

  • Footway assembly and Alimag platform´s guide way disassembly