Client
National Motorway Company a.s.
General contractor
Metrostav DS a.s.
Construction period
February 2022 – May 2023
Destription of the objects:
- Object 543 Modification of water supply DN 800 at km 15,830 – 16,700 D3
- Object 543 Cathodic protection of water supply relocation DN 800 at km 15,830 – 16,700 D3
Technology of construction:
Relocation of the existing water supply feeder DN800 of the grouped water supply Nová Bystrica – Čadca – Žilina OC PN25
Pipe diameter: DN 800
Pipe length: 886.85 m
Pipe material: ductile iron PN 25