Investor:
Považská vodárenská spoločnosť, a.s.
Main contractor:
„Joint Venture VÁHOSTAV – MARTI – Lednické Rovne“
VÁHOSTAV, a.s., Marti a.s.
Construction period:
05/2026 – 05/2028
Description of built structures:
The project involves the completion of the sewerage system for the Lednické Rovne agglomeration:
- Completion of the sewage network in Lednické Rovne within the existing concentrated residential areas that have not yet been connected to the sewerage system (including 4 pumping stations)
- Construction of a new sewage network in the municipality of Dolná Breznica (including 3 pumping stations)
- Construction of sewer connections on the proposed sewer lines (281 units in Lednické Rovne and 297 units in Dolná Breznica)
- Reinforcement of the watercourse bed and banks due to the routing of the sewer line within the watercourse protection zone and its crossings
- Ensuring efficient and effective wastewater treatment – intensification of the Lednické Rovne Wastewater Treatment Plant (WWTP) to a capacity of 5,900 PE (Population Equivalent), replacement of unsuitable mechanical, technological, and electro-technological equipment, and modification of existing structures
- Expansion and reconstruction of the public water supply network, including the construction of water service connections (39 units in Lednické Rovne and 18 units in Dolná Breznica)
Construction Technology:
- Site establishment and preparation, setting-out works
- Saw-cutting/milling of asphalt surfaces
- Trench excavation, shoring of excavation walls, pipe bedding, laying of sewer/water pipes, pipe backfilling and the trench backfilling with compaction
- Establishment of launching/receiving pits
- Crossing of the railway line, watercourse, and state road using trenchless technology
- Groundwater level lowering (dewatering)
- Installation of inspection manholes
- Intensification of the watercourse bed and banks
- Construction of sewer/water connections
- Pressure testing of pipelines, watertightness testing of manholes
- Construction of Pumping Stations (PS), including mechanical technological and electrical technological works
- Intensification of the Wastewater Treatment Plant (WWTP)
- Asphalting of the excavation trench, final surface restoration
- Comprehensive testing and commissioning of the works