Lednické Rovne – Dolná Breznica, Sewerage and WWTP, Phase II, Water Supply System

Investor:

Považská vodárenská spoločnosť, a.s.

Main contractor:

„Joint Venture VÁHOSTAV – MARTI – Lednické Rovne“
VÁHOSTAV, a.s., Marti a.s.

Construction period:

05/2026 – 05/2028

Description of built structures:

The project involves the completion of the sewerage system for the Lednické Rovne agglomeration:

  • Completion of the sewage network in Lednické Rovne within the existing concentrated residential areas that have not yet been connected to the sewerage system (including 4 pumping stations)
  • Construction of a new sewage network in the municipality of Dolná Breznica (including 3 pumping stations)
  • Construction of sewer connections on the proposed sewer lines (281 units in Lednické Rovne and 297 units in Dolná Breznica)
  • Reinforcement of the watercourse bed and banks due to the routing of the sewer line within the watercourse protection zone and its crossings
  • Ensuring efficient and effective wastewater treatment – intensification of the Lednické Rovne Wastewater Treatment Plant (WWTP) to a capacity of 5,900 PE (Population Equivalent), replacement of unsuitable mechanical, technological, and electro-technological equipment, and modification of existing structures
  • Expansion and reconstruction of the public water supply network, including the construction of water service connections (39 units in Lednické Rovne and 18 units in Dolná Breznica)

Construction Technology: 

  • Site establishment and preparation, setting-out works
  • Saw-cutting/milling of asphalt surfaces
  • Trench excavation, shoring of excavation walls, pipe bedding, laying of sewer/water pipes, pipe backfilling and the trench backfilling with compaction
  • Establishment of launching/receiving pits
  • Crossing of the railway line, watercourse, and state road using trenchless technology
  • Groundwater level lowering (dewatering)
  • Installation of inspection manholes
  • Intensification of the watercourse bed and banks
  • Construction of sewer/water connections
  • Pressure testing of pipelines, watertightness testing of manholes
  • Construction of Pumping Stations (PS), including mechanical technological and electrical technological works
  • Intensification of the Wastewater Treatment Plant (WWTP)
  • Asphalting of the excavation trench, final surface restoration
  • Comprehensive testing and commissioning of the works