General contractor
Marti Tunnel AG CH – 3302 Moosseedorf, Switzerland
Construction period
July 2021 – October 2023
Description of the main objects
- 2 caverns: 330 m2 / 213 m long
- cross connections
- shafts
- galleries
Technology of construction
cooperation in excavation in rocks using machines and supporting with sprayed concrete on the objects:
- northern and southern caverns
- parts of the Laupenstrasse logistics gallery, including the gallery connections to the caverns
- cross – connections
- stairs
- lifting shafts