Investor
National Motorway company, a.s.
General contractor
Doprastav, a.s.
Construction period
May 2014 – October 2016
Construction technology:
SO 807-22 Retaining wall on the right side of the cart road to km 23,500 D3
- preparation of the base, drainage system
- assembly of the Maccaferri Gabions system
- filling of the gabion´s wire mesh baskets with rock fr. 36/63 mm a 100/200 mm
SO 058-02 Landscaping of the Čierny potok area
- embankment of dumping place, compaction
- assembly of the Green Terramesh system used for soil reinforcement of the embankment (Maccaferri formwork system)