Client
Stredoslovenská vodárenská spoločnosť, a.s.
General Contractor
Joint venture Valaská, S – T – H
Construction period
September 2017 – August 2020
Technology of construction:
Construction of the sewerage in the total length of 19 km in villages Valaská and Hronec , reconstruction of existed WWTP Valaská, construction of the WWTP for Hronec municipality.
Executed works:
- Sewerage (DN 200 – DN 300) and pressure pipeline, relocation of drink water pipeline (DN 32 – DN 160), construction of the pumping stations (9 pcs), LV connections to the pumping stations (9 pcs).
- Hronec WWTP with capacity of 1 400 p.e.
- Valaská WWTP with capacity of 3 900 p.e.