Client Bundesamt für Strassen ASTRA, Wintenthur, Switzerland General contractor ARGE Tunnel Gubrist, Moosseedorf, Switzerland Construction period February 2018 – March 2021 Description of the objects: Project 3rd Tube of the tunnel Gubrist is a part of the building of the north bypass of Zürich and consists of the following object: Driven tunnel in the length of…
Sorry, this entry is only available in Slovak.
Client National Motorway Company a.s. General contractor JV D1 Prešov – Eurovia SK a.s., Eurovia CS a.s., Doprastav a.s., Metrostav a.s., Metrostav Slovakia a.s. Construction period May 2018 – July 2021 Description of the objects: BO 300-06 Driven tunnel – works include driving and primary lining in the length of ca 1 000 m of tunnel…
Sorry, this entry is only available in Slovak.
Investor DB Netz AG, Hahnstraße 49, 60528 Frankfurt am Main, Germany General contractor ARGE Tunnel Petersberg, c/o Marti GmbH Germany, Zettachring 10A, 705 67 Stuttgart Construction period April 2017 – December 2019 Description of the objects: Renovation of the Petersberg tunnel on line section 3010 “Koblenz – Perl” (km 53,9 + 53 – km 54,7 +…
Sorry, this entry is only available in Slovak.
Client National Motorway Company, Slovakia General Contractor Doprastav a.s. Žilina Construction period March 2017 – February 2018 Object description: Cut-and-cover parts of the tunnels Ovčiarsko and Žilina Construction technology: Concreting to shifting formwork system Executed works: Reinforcement, formwork and concreting of foundation slabs, invert vaults and secondary lining.
Sorry, this entry is only available in Slovak.
Client Landsvirkjun, Iceland General contractor ÍAV Marti Búrfell sf. (JV – Íslenskir aðalverktakar hf., Marti Contractors Ltd., Marti Tunnelbau AG) Construction period April 2016 – October 2017 Object description: Extension of existed hydro power plant with additional increase in power to 100 MW constructing new ground and underground object. Construction technology: Tunnels are driving with drill&blast works by…
Investor Autobahndirektion Südbayern – München, Motorway company, Germany General contractor Joint Venture (Arbeitsgemeinschaft) Tunnel Oberau – Member of JV: TuCon a. s., Slovakia Construction period September 2015 – April 2020 Description of the objects: State road Bundesstraße 2 (B2) München – Garmisch-Partenkirchen, Oberau village bypass, Oberau Tunnel, Germany double – tube road tunnel with a total…
Client DEUTSCHE BAHN AG (DB), German railway company Main contractor Marti GmbH Deutschland, Germany Construction period November 2015 – August 2016 Object description: Neubaustrecke (NBS) Wendlingen-Ulm Planfeststellungsabschnitt (PFA) 2.3VE 230-3 Tunnel Imberg –formwork and concreting works of secondary lining. Single tube – double track railway tunnel in the total length of 499,00 m – driving part in…