Client
Municipality of Bašovce
Project developer:
JV Bašovce, TuCon – MYproject SK
Construction period
March 2025 – August 2025
Description of built structures:
The subject of the performance is the construction of sewerage in the cadastral territory of the Bašovce municipality with a total length of 1,556 km, of which 1,455 km are gravity sewers and 0,101 km pressure pipeline.
The subject of performance is also the construction of 2 pumping stations and 87 sewage connections.
Construction technology:
- Installation and preparation of the construction site, surveying works
- sawing/milling of asphalt surfaces
- excavation of the trench, lining of the trench walls, bed under the pipeline, laying of sewer pipes, backfilling of the pipeline and backfilling of the trench with compaction
- lowering of the groundwater level
- installation of revision shafts
- realization of sewage connections
- pipeline pressure tests, shaft watertightness tests
- construction of pumping stations
- asphalting of trenches